Front axle shafts assembled, short side installed.
Accessory bracket, alternator, and power steering pump installed. Pulleys cleaned up. Thermostat and new adjustable housing installed.
Fuse/relay block connected to the harness. Power applied and pedal/throttle body and fuel pump feed tested good.