Final assembly has begun. I needed to get the pile of parts back into the shop to make winter storage room.
Engine got a hole drilled for the dip stick, oil pan installed. Trans got the torque converter filled and installed and then mated to the engine. Trans/t-case adapter kit assembled with reluctor ring, RTV, seals, and Loctite. Then refitted the pair back into the chassis.
A little toaster oven baking made the reluctor ring slide on a bit farther
Finally married for good
...and back to this point