TECHNICAL FORUMS => Project Builds => Topic started by: smichaelR22 on December 20, 2016, 01:20:37 PM
Title: 83 CJ7
Post by: smichaelR22 on December 20, 2016, 01:20:37 PM
was looking for a winter project and picked this guy up
glass body rotten frame new lift kit new frame
keeping old school and streetable on 33-35's
comming along nicely. frame swap complete, body mounted, lines run, brake and hub work done.
exhaust, steering, cooling, fuel tank, interior, electrical left
Title: Re: 83 CJ7
Post by: smichaelR22 on January 04, 2017, 08:49:43 AM
been about a month since i started this build- its about 95% complete
frame swap and chassis plumb done tub mounted axles rebuild and re braked all new ujoints new steering shaft, Auto linkages and column rebuilt auto trans filter and flush D300 sourced and installed new tank, fuel system, HEI 1 wire distributor wiring cleaned up and all hacks / tapes removed engine fired and timed interior installed
remaining items replace steering box / steering linkage few non critical electric items install roll bar / lock hard top down get keys source brake booster / MC run front brake hardlines seat belts rebuild hard top latches
Title: Re: 83 CJ7
Post by: smichaelR22 on January 09, 2017, 09:34:31 AM
just about done, all inspectable items done other than a set of belts on the way.